LARC PROJECT: UGANDA

http://www.chpa.co/Images/Acrobat-File.jpg
Uganda Project Abstract May 2017
http://www.chpa.co/Images/Acrobat-File.jpg
Uganda Progress Report May 2017
http://www.chpa.co/Images/Acrobat-File.jpg Uganda Progress Report November 2016
http://www.chpa.co/Images/Acrobat-File.jpg Uganda Viral Load Dashboard

http://www.chpa.co/Images/Acrobat-File.jpg Uganda Progress Report August 2016
http://www.chpa.co/Images/Acrobat-File.jpg
Uganda proposal
http://www.chpa.co/Images/Acrobat-File.jpg Uganda Project CMM and BPM


Uganda Team: Piggs Peak, Swaziland, May 2017

Uganda Team: Entebbe, Uganda November 2016

Back row: Samuel Wasike; Judith Nanyonjo; Harriet Nambozo; Cuthbert Agolor; Irene Atuhairwe;

Mary Naluguza; Chris Okiira Front row: Martin Zziwa; Catherine Odeke; Florence Tugumisirize


Uganda Team: Dar es Salaam, Tanzania August 2016

Joseph Kabanda; Martin Zziwa; Florence Tugumisirize; Catherine Odeke; Cuthbert Agolor; Judith Nanyonjo; Mercy Mwanja; Harriet Nambozo


Uganda Team: Johannesburg, South Africa February 2016
(Back row) Catherine Odeke; Christina Mwangi.

(Front row) Onzia Margaret Nyakuni; Janet Obuni; Rebecca Nassuna.


PROJECT DETAILS

Objectives
The major objective is to improve VL monitoring of patients on ART in Masaka district. Specific objectives are:

1. To increase the proportion of promptly documented viral load results in patient files among the 25 facilities in the Masaka Regional Referral Hospital (Masaka RRH) hub coverage to 95%.

2. To increase the proportion of patients who have been managed according to national VL guidelines by 95%.

3. To compile guidelines and standards on facility based VL results flow, which can be later on scaled up country wide.